Shenzhen Newbetter Lighting Technology Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Chen Andy
  • Company Name : Shenzhen Newbetter Lighting Technology Co., Ltd.
  • Tel : 86-755-33215738
  • Fax : 86-755-33215737
  • Address : Guangdong,Shenzhen City,Fengmen ao Industrial District Bantian street
  • Country/Region : China
  • Zip : 518129

high quality, AR111 5*2w light bulb, G53, CE&RoHS

high quality, AR111 5*2w light bulb, G53, CE&RoHS
Product Detailed
High quality, AR111 5*2w light bulb, G53 1. Larger beam angle, the light scope enlarged 2. high lumen LED chip

High quality, AR111 5*2w light bulb, G53

Technical Specifications:

Light Source: Epistar,Edison or CREE LED

LED qty:5LEDS*2W

Color Range: 2700K-7000K

Operation current: 450mA

Power consumption:5x2W

Input:  12V AC/DC    or  85-264V AC

Beam angle: 15, 30, 45, 60 degree optional

Lifespan: >30000Hours

Base:G53

Diameter: 111mm 

Length: 74mm

Highest optical efficiency: 600~800Lm

Work environment temperature: -40~60°C

IP Rating(Work environment): Indoor use, applicable for dry environment

CRI: >80

How to order:Product Number: HPL-5310A-1105XXB-H1

Product Code: NBL-0310LB

A- Color (N-Natural white,  W-Warm white, C-Cool white, R-Red, G-Green, B-Blue, Y-Yellow)

B- Brand of Light Source ( C-Cree LED, E-Edison LED, Z-Epistar LED )

XX- Beam angle ( 15, 30, 45, 60degree optional)

Manufactory Profile:

For more than 3 years, Shenzhen Newbetter Lighting Technology Co.,Ltd  is a leading high-tech manufacturer of LED application lights. We are proud to offer high-quality,high-performance LED lighting solutions at affordable price. We will ensures that you get fixtures that are optimally designed to maximize the benefits of this cutting edge technology.

Application1) Building (architecture or home) decoration2) Market3) Amusement park and theater  lighting4) Emergency hallway lighting5) Shopping mall, restaurant, hotel, meeting room and advertisement  signs backlighting

Trade Terms: 1. Payment: T/T only 30% deposits before production, 70%balance to be paid before deliver (Western Union or Money gram are welcomed)2. Production Lead Time for 100~500pcs: 7 work days3. Sample can be delivered in 3-5 work days4.Shipping freight are quoted under your requests5.Shipping port: Shenzhen, Mainland China6.Discounts are offered based on order quantities7.MOQ: 2 Pieces

Our service:1.Your inquiry related to our products or prices will be replied in 24 hours.2. Well-trained and experienced staffs to answer all your enquires in fluent English3.OEM&ODM, any your customized lightings we can help you to design and put into product

high quality, AR111 5*2w light bulb, G53, CE&RoHS



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.